Tagged

The following items are tagged with field

VSAT test system
SPRESSO Cable Trench
GSN-NWAO
Installing Seismographs
IRIS summer intern Amanda Thomas and others installing seismographs.
PASSCAL Deployment, Hill AFB, Utah
Student siting materials
Anne Trehu, Bob Busby and John Tabor review materials used by students to site Transportable Array stations.
Tiwi short period station
Superstition Hills Aftershock deployment
Students Practicing Field Techniques for TA Siting
Students learn field techniques needed to locate sites for Transportable Array stations.
Reflection Experiment
IRIS interns assist USGS Seismologist Michael Rymer during a reflection experiment.
Antarctica Sled
GSN-BORG
Superstition Hills Aftershock deployment
Pete setting up equipment.
Reflection Experiment
USGS Seismologists, Michael Rymer takes a turn with the hammer during a reflection experiment in California that involved IRIS interns
TA Station Z17A
Engineer installs equipment at Transportable Array station Z17A in Arizona.
Huddle Test, RUSH Experiment
Alaskan Station
IRIS summer intern Justin Brown servicing a seismograph station Alaska in 2004.
TA Station I16A
A rubber membrane is placed around the end of the vault to help minimize water entry into the vault.
La RISTRA Service
Construction Materials
A truck with the vault, cement, fencing and other materials for a Transportable Array station arrives at the site.
TA Station I16A
A backhoe digs a small conduit for communications lines for Transportable Array station I16A near Newdale, Idaho.
Reflection Experiment
Cathy Snelson leads 2007 IRIS interns in a reflection experiment during the IRIS internship orientation week.
New Zealand, broadband station
TA StationI16A
The construction crew pours cement into the bottom of a vault for a Transportable Array station near Newdale, Idaho.
TA Station I16A
A member of the construction crew readies a vault for a Transportable Array station near Newdale, Idaho.
Examining a Fault Scarp
2007 interns examine a fault scarp during a field trip lead by Peter Mozley of New Mexico Tech Dept of Earth and Environmental Science
Noel Yunan3
400th Station
Installing a Transportable Array station.
Deploying Geophones
07' intern Matt Beachley deploys geophones as part of the IRIS internship orientation week held at the IRIS PASSCAL Instrument Center and New Mexico Tech.
Station Installation - Erebus
Installing a Solar Panel
Installing a Transportable Array station solar panel.
GSN-DGAR
Kobe Huddle
400th Station
Installing a Transportable Array station.
New Mexico Tech Interns
IRIS summer interns work to collect reflection data during the intern orientation week at New Mexico Tech.
GSN-MSEY
Kenya Namanga Students
GSN-FUNA
Kenya Little Helper
Kenya
400th Station
Installing a Transportable Array station.
Kenya Field Repair
Installing a Station in Kenya
GSN-SPRESSO
Trench for Instrumentation Building
GSN-QSPA
Student Siting Activities - Taking notes
Student Siting Activities - Taking notes
GSN-SPRESSO
PASSCAL Seismic Hill
X Marks the Spot
Equipment
GSN-SPA
GSN-PTCN
Solar Panel
Solar panel at a Transportable Array station.
GSN-RAO
Anatahan Equipment
Vault
A vault at a Transportable Array station.
GSN-RAO
GSN-TRIS
Vault
A vault at a Transportable Array station.
TA Team
Transportable Array team around a solar panel.
Steve Roberts
Steve Roberts (ASL) installing a VSAT antenna at Dugway, Utah (DUG).
Alaska
COWI Install
Alaska Noel Students
GSN-RAO
Transportable Array Station
Transportable Array station C08A in Almira, WA
Y15A Station
Y15A Transportable Array Station among the cacti.
USGS Broadband Station
Bob Busby programming an adopted USGS broadband station in Ingram Canyon, Northern California pressed into service for USArray.
GSN-KNTN
Anatahan Eruption
First historical eruption of Anatahan Island recorded on May 10, 2003 by PASSCAL instruments deployed for use in the Mariana Subduction Factory Imaging Experiment.
GSN-KNTN
Jared and Neil next to vault.
Installing a Station
GSN-KNTN
GSN-KNTN
GSN-KNTN
PASO Tres real-time
Installing a radio telemetered station in Parkfield, California
Staging Equipment
Staging of equipment for a Flexible Array deployment in Washington State (CAFE).
STS-2 Seismometer
An STS-2 seismometer fully packed with sand by diligent termites. Project HiCLIMB, 2005.
Ethiopia
Flexible Array installation, CAFE
CAFE broadband station installation in Western Washington.
Active Source Deployment
Chris Hayward
Chris Hayward
Chris Hayward